The Client's Vision

The Brief

What the client wanted

The existing bathroom needed a full refurbishment and a layout that made shower access easier. The client supplied the bathroom suite, while the brief called for a large low-threshold, non-slip shower tray, new finishes and a feature wall.

What we delivered

We stripped out the old suite, tiles and flooring, then installed new plumbing and electrical feeds for the revised layout. The shower area was tanked before tiling, and the client-supplied suite and final fittings were installed to complete the room.

Project Highlights

  • Existing bathroom stripped back to prepare for a new layout

  • Plumbing and electrical feeds renewed for the new fixtures

  • Shower area tanked before the tiling work

  • Large low-threshold, non-slip shower tray for easier access

  • Client-supplied bathroom suite fitted and completed in two weeks

Outcome

The Result

The completed bathroom replaced the old suite and finishes with a new tiled layout built around easier shower access. Tanking the shower area before tiling gave the work the right base before the client-supplied suite went in.

Our bathroom renovation and installation service covers the full process, from strip-out and plumbing through to tiling and final fitting. You can also view the Hutton bathroom installation for another Belvia bathroom project.