Bathroom Installation in Tiptree, Essex
Full bathroom refurbishment in Tiptree with a new layout, tanked shower area, tiled feature wall and a low-threshold non-slip shower tray.
The Client's Vision
The BriefWhat the client wanted
The existing bathroom needed a full refurbishment and a layout that made shower access easier. The client supplied the bathroom suite, while the brief called for a large low-threshold, non-slip shower tray, new finishes and a feature wall.
What we delivered
We stripped out the old suite, tiles and flooring, then installed new plumbing and electrical feeds for the revised layout. The shower area was tanked before tiling, and the client-supplied suite and final fittings were installed to complete the room.
Project Highlights
Existing bathroom stripped back to prepare for a new layout
Plumbing and electrical feeds renewed for the new fixtures
Shower area tanked before the tiling work
Large low-threshold, non-slip shower tray for easier access
Client-supplied bathroom suite fitted and completed in two weeks
Project Photos
Browse the full project journey. Click any image to view full size.
Full GalleryOutcome
The ResultThe completed bathroom replaced the old suite and finishes with a new tiled layout built around easier shower access. Tanking the shower area before tiling gave the work the right base before the client-supplied suite went in.
Our bathroom renovation and installation service covers the full process, from strip-out and plumbing through to tiling and final fitting. You can also view the Hutton bathroom installation for another Belvia bathroom project.










